«sep 2024»
MOTUWETHFRSASU
2627282930311
2345678
9101112131415
16171819202122
23242526272829
30123456
«oct 2024»
MOTUWETHFRSASU
30123456
78910111213
14151617181920
21222324252627
28293031123
45678910
«nov 2024»
MOTUWETHFRSASU
28293031123
45678910
11121314151617
18192021222324
2526272829301
2345678
«dec 2024»
MOTUWETHFRSASU
2526272829301
2345678
9101112131415
16171819202122
23242526272829
303112345
«jan 2025»
MOTUWETHFRSASU
303112345
6789101112
13141516171819
20212223242526
272829303112
3456789
«feb 2025»
MOTUWETHFRSASU
272829303112
3456789
10111213141516
17181920212223
242526272812
3456789
«mar 2025»
MOTUWETHFRSASU
242526272812
3456789
10111213141516
17181920212223
24252627282930
31123456
«apr 2025»
MOTUWETHFRSASU
31123456
78910111213
14151617181920
21222324252627
2829301234
567891011
«may 2025»
MOTUWETHFRSASU
2829301234
567891011
12131415161718
19202122232425
2627282930311
2345678
«jun 2025»
MOTUWETHFRSASU
2627282930311
2345678
9101112131415
16171819202122
23242526272829
30123456
«jul 2025»
MOTUWETHFRSASU
30123456
78910111213
14151617181920
21222324252627
28293031123
45678910
«aug 2025»
MOTUWETHFRSASU
28293031123
45678910
11121314151617
18192021222324
25262728293031
1234567
AlbaniaAndorraArmeniaAustriaAzerbaijanBelgiumBosnia HerzegovinaBelarusBulgariaCroatiaCyprusCzechiaDenmarkSpainEstoniaFaroe IslandsFinlandFranceGreat BritainGeorgiaGermanyGreeceHungaryIrelandIcelandIsraelItalyKosovoLatviaLiechtensteinLithuaniaLuxembourgMoldovaNorth MacedoniaMaltaMontenegroMonacoNetherlandsNorwayPolandPortugalRomaniaRussiaSloveniaSerbiaSwitzerlandSlovakiaSwedenTürkiyeUkraine
 
EnglandScotland
Other EHF Sites 

29.07.2019, 12:30
Cologne’s LANXESS arena gets new video walls
«Go back »Print Version


NEWS: Bigger and better: LANXESS arena, the home of the VELUX EHF FINAL4 since 2010, is currently being equipped with four brand new video walls. This will bring the action to the spectators closer than ever before
»2019-20 Men's News
»
»
 

Cologne’s LANXESS arena gets new video walls

The impressive video cube – each of the four sides measure 5.2 x 5.2 metres and the entire construction weighs 19 tons – inside LANXESS arena has seen handball champions come and go.

Used for the first time in earnest at the Men’s World Championship 2007 when Germany won handball gold, it has also displayed the most monumental match scenes and been a core part of almost every opening show ever since the first VELUX EHF FINAL4 in 2010.

Back then, it was said to be the biggest and most modern video cube in Europe.

However, when the 2020 edition of the EHF FINAL4 throws off on 30 May next year, the cube will have become a part of arena history and been replaced by something bigger and better.

These days, the old cube has been lowered to the arena floor; the screens were dismounted, the supporting steel structure behind them was taken apart – and when all this has been finished and a new supporting structure, four new video walls will be installed.

Each new wall consists of 80 individual panels. Each wall will measure 8 x 4.5 metres and will thus be nine square metres bigger than one side of the old cube – and feature a visibly improved resolution.

Furthermore, the four new video walls can be moved individually and will bring all the action much closer to the spectators inside the arena.

At the same time, LANXESS arena, at the height where the first hospitality boxes are located, will be equipped with a new ‘LED ring’ running all around the arena, equalling of total of 302 metres in length.

For all handball fans wishing to be part of the VELUX EHF FINAL4 2020, there is the opportunity to put your name on a waiting list to be among the first who are informed about future sales phases.

Photos: LANXESS arena


TEXT: EHF / ts
 
Share
CONTACT FORM